NK Parks
Industrial Cluster

Domodedovo

Moscow

17

km
from Moscow Ring Road, Simferopolskoe highway

2,9

mln. sq.m
total area

Simferopolskoe highway

  • Infrastructure
  • Domodedovo
  • Domodedovo 1
  • Domodedovo 2
  • Domodedovo 3
Infrastructure
Domodedovo
Domodedovo 1
Domodedovo 2
Domodedovo 3

Future development

Industrial building

new generation

  • German technology 01
  • Average Construction Time – 5 Months 02
  • Turnkey Construction 03
  • Wide Choice of Options 04
  • Compliant with FM Global Standards 05
from

The high pre-fabrication quality of our buildings’ primary structural components is guaranteed by means of a robotic belt-line production process using German technology. The buildings are constructed in a framework method, which requires no welding.

70% of your building is prefabricated before the start of any construction operations. This significantly reduces facility construction time, while also minimizing the human and weather factors during its assembly at the building site.

Front-end engineering and design, expert review, receipt of permits and approvals for construction, building process based on German technology, installation of internal engineering systems, start-up and adjustment operations, facility commissioning, hard-surfacing and overall surrounding area development in accordance with the general plan.

Our multi-purpose buildings can be used for storage, distribution, or manufacture and are constructed to meet your precise requirements.​

Since 2012 all buildings constructed by NK group comply with the FM Global property insurance standards. The facilities have a high-level of fire-resistance and constitute a highly liquid asset on the secondary property market.

why choose Industrial Cluster Domodedovo

1

5 month — is the average construction period of a PNK built-to-suit industrial building


The park is equipped with pre-installed utilities and other infrastructure.
You are getting a ready-made building with all infrastructure and improvements to the surrounding area as described in the general plan.

2

Convenient location


The industrial cluster will be located within 17 km from Moscow between the M2 and M4 federal highways.
A network of highways will be situated between the industrial parks in the cluster with convenient interchanges between them.
Workforce availability: more than 1 100 000 people in a radius of 20 km.

3

Labor Focused Development


Industrial Cluster is featuring amenities to attract and retain labor.
An infrastructure of social amenities, which will include: a recreational area with walking and jogging tracks, sports fields and playgrounds, a kindergarten, apartments and hostels for shift workers, a food court and retail shopping areas.

Sign up here for the latest NK news

Make request

Please contact us if you should have any questions

* Required fields

By clicking «Send request», you agree to submit your information to the NK group, which agrees to use it in accordance with its privacy policy.

Make request

Please contact us if you should have any questions

* Required fields

By clicking «Send request», you agree to submit your information to the NK group, which agrees to use it in accordance with its privacy policy.

Make request

Please contact us if you should have any questions

* Required fields

By clicking «Send request», you agree to submit your information to the NK group, which agrees to use it in accordance with its privacy policy.

Make request

Please contact us if you should have any questions

* Required fields

By clicking «Send request», you agree to submit your information to the NK group, which agrees to use it in accordance with its privacy policy.

Make request

Please contact us if you should have any questions

* Required fields

By clicking «Send request», you agree to submit your information to the NK group, which agrees to use it in accordance with its privacy policy.

Make request

Please contact us if you should have any questions

* Required fields

By clicking «Send request», you agree to submit your information to the NK group, which agrees to use it in accordance with its privacy policy.

Make request

Please contact us if you should have any questions

* Required fields

By clicking «Send request», you agree to submit your information to the NK group, which agrees to use it in accordance with its privacy policy.

Built-to-suit construction

of industrial facilities

We build

price
27 500

in operating NK Parks

Learn more
price
on request

on your land

Learn more

Make request

Please contact us if you should have any questions

* Required fields

By clicking «Send request», you agree to submit your information to the NK group, which agrees to use it in accordance with its privacy policy.

Make request

Please contact us if you should have any questions

* Required fields

By clicking «Send request», you agree to submit your information to the NK group, which agrees to use it in accordance with its privacy policy.

Thanks!

Thank you for contacting us. Your application is accepted.

Our specialist will contact you during the working day.

Thanks!

Your application has been successfully submitted.

We will carefully study your proposal and contact you if interested.

Thanks!

Thank you for subscribing to our newsletter

You will receive information on the specified E-mail address

Error

Your address has already been subscribed.